Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water District 5 topic

No spam. Unsubscribe anytime.

Pembroke board ratifies Water District No. 5 after state debt threshold change

Pembroke Town Board · July 25, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After the state comptroller raised a debt-service threshold, the Pembroke Town Board rescinded a 2022 final order and unanimously ratified the formation of Water District No. 5, approving a maximum estimated cost of $2,055,000 and noting costs will be borne by district residents.

The Pembroke Town Board on July 25 voted unanimously to ratify the formation of Water District No. 5 after the Office of the State Comptroller increased its debt-service threshold.

Supervisor Thomas Schneider told the board the change to the comptroller’s threshold meant the town needed to rescind the Final Order adopted in 2022 and re-open the matter so the district could be formed without the state’s prior permission. The board approved a Public Interest Order that the record states will take effect immediately and which keeps the maximum estimated cost at $2,055,000.

The resolution states the estimated first-year operating, maintenance, debt service and other charges per equivalent dwelling unit would be $1,048, and a one-time estimated installation cost per unit of $1,140. The resolution also records that the planned improvements — including potable water and distribution pipes and incidental apparatus — will be constructed only if the necessary funds are made available and that no public funds will be expended; costs will be borne by the residents of the district.

Councilman Edward G. Arnold Jr. moved the ratification and Supervisor Schneider seconded; the vote was recorded as Ayes: Arnold, Manne, Conti, Schneider; Nays: None.

The board previously published and posted required notices and held hearings (the record cites a prior hearing and the board’s earlier February 9, 2023 Final Order). The resolution notes the engineers who prepared the map, plan and report are Clark Patterson Lee (Jeremy DeLyser, P.E.). The meeting minutes also record that engineers hope to bid work on Water Districts 4 and 5 this fall.

Next steps identified in the record are administrative: with the board’s ratification in place, the town will proceed under the terms of the map, plan and report and the financing method described in the record. The resolution also rescinded the earlier Final Order to align the paperwork with the comptroller’s changed threshold.