Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Subdivision Regulations topic
No spam. Unsubscribe anytime.
Planning commission debates driveway permits, 18‑foot minimum road width and limits on simple subdivisions
Summary
The commission reviewed proposed subdivision regulation changes — formalizing driveway permits, considering an 18‑foot minimum roadway width for major subdivisions, and debating limits on repeated simple subdivisions from a single donor tract.
Get email alerts on the Subdivision Regulations topic
No spam. Unsubscribe anytime.
At its meeting, the Bedford County Planning Commission spent substantial time reviewing proposed changes to subdivision regulations, including formalizing driveway permits, setting minimum roadway widths for major subdivisions and limiting how frequently a single donor tract can produce simple subdivisions.
Planning staff said the commission previously instructed the office to begin issuing driveway permits and is preparing more specific language (based on standards provided by Mark Clanton) to include in the county subdivision regulations. Staff said the office will draft written standards and return them for review.
On minimum roadway width, staff offered a draft example tying required road classification on the county roadway map to a minimum continuous paved width. "An example has been discussed ... minimum width of 18 ft," staff said, explaining the measure is intended to protect life‑safety access for emergency vehicles, school buses and the traveling public on rural roads.
Commissioners discussed exemptions for small developments and whether the rule should apply to simple subdivisions that use existing road frontage. Several members suggested adding an ingress/egress requirement so that entrances from a county road are built wide enough for emergency access even if the local road is narrow. Reed Farmer and others urged tying any limits to road frontage and practicality rather than an inflexible count.
Staff also proposed limiting any single donor tract to one simple subdivision every 24 months (each simple subdivision can be up to five lots) to prevent incremental, administrative filings that sidestep a fuller planning review. Commissioners debated whether to shorten the period or reduce permitted lots to three; several asked staff to return with draft language and engineering guidance.
The commission directed staff to draft regulatory language, consult with the county road superintendent and fire officials on ingress/egress and turning radii, and bring written proposals to the next meeting.

