Commission approves minor septic modification at 17 Forest Road after contractor altered water-line placement

Westford Conservation Commission · June 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Allen Engineering reported a contractor-installed water line required relocating a previously planned septic tank; the board of health approved the Title 5‑compliant relocation and the Conservation Commission approved the minor modification.

The Westford Conservation Commission approved a minor modification June 24 for work at 17 Forest Road after the project team said a water line was installed through the originally planned septic-tank location.

Mark Slayton of Allen Engineering told the commission the contractor installed a water line through the planned tank footprint, requiring an alternate tank location. He said the new location remains more than 50 feet from the wetland and conforms with Massachusetts Title 5 septic requirements; the Board of Health had already approved the revision.

The applicant also proposed replacing the leaching field with a smaller-footprint GeoMat system to reduce disturbance. Commission members asked for clarification about whether the leach-field replacement resulted from the water-line relocation; the applicant said the leach-field replacement was an independent decision to provide a brand‑new septic system for a new house.

After a brief public and commissioner exchange, a motion to approve the change as a minor modification passed.

What’s next: staff will record the minor-modification approval and coordinate any required as‑built submittals and recording with the Board of Health.