Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Easement topic

No spam. Unsubscribe anytime.

Resident’s request to run discharge through town culvert prompts Selectmen to recommend separate private sleeve or town‑meeting easement

Stonington Board of Selectmen · June 28, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Penn Rhodeen asked to run an OBD (septic discharge) pipe through a town culvert. The town manager said the town prefers property owners to run private sleeves and warned of liability if town drainage failed; the board signaled the matter may require a town‑meeting easement if abutter easements are provided.

A property owner’s request to run a septic discharge (OBD) pipe through a town culvert prompted Selectmen to caution that the town generally prefers private runners and that any use of the town’s culvert may require formal easements and a town‑meeting vote.

Penn Rhodeen raised the issue during a Selectmen meeting, asking if the town would permit his OBD pipe to pass through a culvert. Town Manager Billings said the town prefers that owners provide their own culvert sleeve to avoid the risk that a plugged or damaged town culvert would make the town financially or operationally responsible for private plumbing. Selectmen discussed the need for abutter easements and specifications to protect town road standards.

Why it mattered: Allowing private drainage through a town-controlled culvert can create maintenance obligations and legal exposure if the pipe plugs or settlement occurs, officials said. The town indicated it would consider an easement on the Annual Town Meeting warrant only if required abutter permissions and construction specifications were in place.

Board direction: The Selectmen instructed staff to identify requirements and, if necessary, place an easement article on an upcoming town meeting warrant contingent on abutter easements and adherence to road-cut standards.

Next steps: The manager said she would follow up with the property owner and legal counsel to verify whether a road‑cut easement and the necessary abutter permissions are available before the Selectmen would place the matter on a warrant.