Summary

During a May 5 road tour and meeting, staff identified a potentially out‑of‑service meter at the village well house that has not been serviced since 2014 and directed removal and servicing plus work to restore the phone dialer and correct chemical pump wiring.

Rushford Village staff reported recurring faults at the village well house during a May 5 road tour and regular council meeting and described steps to reduce future failures. Public Works/Maintenance Supervisor Darrin Dessner said the well‑house meter has not been serviced since 2014 and could be causing the pump faults recorded this year.

Dessner described a plan to remove the meter for servicing, install a sleeve as an interim measure, and have electrical contractor Norman’s Electric wire the pumps directly to the variable‑frequency drive (VFD) so chemical pumps operate properly. The phone dialer at the well house was reported not to be working; staff said installation needs to be completed so alarms will reach on‑call personnel. Dessner also noted tubing for chemical feed should be replaced annually.

The minutes record that MRWA (Minnesota Rural Water Association) reviewed the pump house and hydrant issues but could not determine the root cause; the minutes state McCarthy Well suspects the meter on the pipe may be the problem. The council directed staff to proceed with the planned servicing and interim measures and to report back on results.

No vote was required for the operational direction, and the minutes do not list a formal timetable for when the meter will be removed and serviced.