Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Dam Breach topic

No spam. Unsubscribe anytime.

After two breaches, Otis commission directs emergency certification and wetlands survey at 0 Stebbins Road

Otis Conservation Commission · April 15, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Following reports that a dam at 0 Stebbins Road gave way twice, the commission voted to ask the landowner to file an emergency certification with an NOI, hire a commission-approved wetlands consultant at the owner's expense, and stop depositing fill or altering the area.

The Otis Conservation Commission moved unanimously to require the landowner at 0 Stebbins Road to seek an emergency certification in conjunction with filing a notice of intent and to hire a wetlands consultant approved by the commission to survey the site and recommend long-term corrective measures after the dam reportedly gave way on two occasions.

The landowner was directed to cease and desist depositing fill and altering the area; the commission noted the town may investigate costs associated with the breach. Chris Chaffee seconded the motion, which passed unanimously. The meeting adjourned at 6:50 p.m.