Agency takes no action on 110 Pine Knob Terrace pool proposal pending septic review

Milford Inland Wetlands Agency · April 15, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The agency heard an application by Robert Longo for an in-ground pool at 110 Pine Knob Terrace with work within 100 feet of wetlands and recommended no action April 15 while awaiting septic/health-department clearance and applicant responses to requested items.

The Milford Inland Wetlands Agency took no action April 15 on a proposed in-ground pool at 110 Pine Knob Terrace, citing outstanding information from the applicant and a need for septic-system clearance.

Mary Rose introduced the old-business item (IW260011), describing a proposal by Robert Longo for a 20-by-20 in-ground pool, a 15-by-30 concrete patio, a three-sided stone surround with stepping stones, and pool equipment, with work proposed within 100 feet of a flagged wetland. She told the agency that portions of the wetland are both on-site and off-site and that the applicant had not responded to a list of requested items transmitted after the last meeting. Mary Rose said she spoke with the surveyor, who indicated they were working with health-department requirements.

"I would recommend no action this evening," Mary Rose said, noting the applicant must demonstrate that the existing septic system is adequate or provide a secondary septic area before taking up yard space with a pool.

The agency did not vote to deny or approve the application; instead, members left the item pending receipt of the outstanding materials and any health-department approvals. The item will return to the agency when staff and the applicant can supply the requested information and the city engineer’s review, if applicable.