Summary

Staff presented schematic-design changes for Feeley Field Phase 2 to extend ADA access, revise the access route, add dugouts and irrigation; construction is slated for summer 2026 with temporary fall field closures; accessibility advocates raised concerns about seating, portable restrooms and connecting paths.

The commission received a schematic update on Feeley Field Phase 2 focused on accessibility and field-condition improvements. Kyle presented plans to extend ADA access to the east field, address drainage, add new dugout structures and backstop fencing, and install irrigation. The proposed ADA route was revised to go around the retaining wall rather than through the dugout to improve circulation.

Victor Garofalo said the work is scheduled for summer 2026; the fields will be closed temporarily in the fall for construction but are expected to be available for spring 2026 play. The design will require Conservation Commission approval because some work is in buffer areas; staff noted the possibility of installing a 6‑foot chain‑link fence along the walkway for protection.

Public guest Kay Bell, who identified herself as an accessibility advocate, urged the commission to add companion seating, portable restrooms, and accessible picnic tables and recommended a connecting path between the existing dugout path and the new accessible route to prevent users from becoming stranded on grass. Kyle said handrails were not required due to the low slope, and he confirmed that making the tennis courts accessible is not in the current project scope. Commissioners said user-group input will inform final design decisions.

Next steps: staff will pursue Conservation Commission approvals and continue user‑group outreach; the commission did not take a formal vote on the schematic at this meeting.