Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Economic Development topic

No spam. Unsubscribe anytime.

North Star Manganese reports ongoing technical work; DNR inspection complete

City Council of the City of Emily · June 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Rick Sandri of North Star Manganese told the Emily council the firm is continuing engineering and process optimization toward a Scoping Study/Preliminary Economic Assessment; the Minnesota DNR completed its final inspection related to the 2023 drilling program and indicated reclamation and boring seals are complete.

Rick Sandri of North Star Manganese provided the council an update on exploration and study work during the Aug. 12 meeting.

Sandri said NSM is continuing engineering and process optimization aimed at completing a Scoping Study/Preliminary Economic Assessment (PEA), with work extending into mid‑2025 (transcript phrasing). He told council minutes that the Minnesota Department of Natural Resources completed its final inspection tied to the 2023 drilling program and reported that boring seals and site reclamation are complete, with no further follow up required. Sandri said technical visits and core sample assessment work will continue into the summer and fall and that NSM is pursuing mineral lease discussions with the DNR on certain state mineral lands in the Emily area. He said Electric Metals/NSM will present PEA results and proposed next steps to the City once the PEA is finished.

The council received the report as an informational update; no formal council action was recorded.