Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Amended Plat topic

No spam. Unsubscribe anytime.

Amended final plat for West Park subdivision approved after minor as‑built revision request

Berea Planning Commission · June 23, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved an amended final plat for West Park after Stewart Spencer (Spencer Line Surveying) said a relocated force main allowed previously omitted lots to be platted; staff requested a small as‑built correction to reflect a 14‑inch line size.

Stewart Spencer of Spencer Line Surveying presented an amended final plat for West Park Subdivision on behalf of KJC Construction Inc., reporting that the force main had been relocated and the previously unplattable lots were now ready to be added back into the final plat.

City staff said construction is complete and the bonds are in place; they requested a minor update to the as‑built drawings to correct a pipe size shown on the plans (plans had shown a 12‑inch tie‑in but the installed line is 14‑inch). Staff asked for a contingency to allow revisions to as‑built drawings.

A motion to approve the amended final plat was seconded and carried by roll call. The commission indicated the as‑built revision should be submitted for final documentation.

The approval moves the amended plat forward for recordation subject to the as‑built update.