Village committee hears progress update on lagoon work, flags ice and power issues
Summary
Three Oaks staff said contractor Oselka has been working on lagoon controls since Dec. 2024; a valve now allows isolation of ponds 1 and 2, spring discharge is planned for March 1, and crews will seek 3-phase power from AEP for the lift station. Staff warned ice could complicate discharge testing.
Get email alerts on the Sanitary Sewer topic
No spam. Unsubscribe anytime.
Manager Faulkners Public Service Committee heard an update Feb. 7 on the villages wastewater lagoon project, including construction progress, operational timing and concerns about ice that could affect required discharge testing.
Paul Harvey told the committee that contractor Oselka has worked at the lagoons since December 2024 and has installed a water-control structure and a valve "which gives the ability to isolate ponds 1 and 2." Harvey said the village plans to begin spring discharge on March 1, 2025, and that staff is coordinating with AEP to secure 3-phase power at the lift station.
Matt Lindsey said crews plan to close the valve between ponds 1 and 2 next week and aim to isolate the ponds by Feb. 14, 2025. Lindsey flagged operational concerns about ice on the ponds: "The testing will be hard to pass if the ice is too thick," Nathan Smith added, offering assistance with the work.
The committee did not take a formal action beyond receiving the update. Faulkner said staff will continue coordinating with AEP and the contractor and will present any schedule or cost changes to the Village Council as needed.