Summary

Town staff reported well-house heater failures during cold weather and proposed replacing temporary $50 heaters; the board also discussed drafting meter-installation guidelines and noted a Nov. 1, 2027 deadline to inventory lead service lines.

Staff member (S3) told the board that during recent cold weather the town’s inexpensive electric well-house heaters failed, causing air bubbles to shut down and one pump to freeze while a backup pump ran. Chair (S1) relayed a vendor estimate of about $6,600 for a higher-quality replacement heater and staff recommended purchasing one unit per well house (two total) to reduce freeze risk.

Following the heater discussion, Staff member (S6) detailed widespread problems with past meter installations — meters buried under soil, plastic fittings, improperly placed shutoffs and temporary clamps — and proposed that the town adopt minimum installation and inspection standards. S6 recommended a “copper in, copper out” requirement near the meter and that contractors register at the town office so staff can inspect work after completion. "I think we need to come up with some sort of guidelines," S6 said, adding that the town would require contractors to expose work for inspection or re-dig if buried before inspection.

Committee member (S2) tied the meter-inspection discussion to regulatory compliance, reminding the board of a Nov. 1, 2027 deadline to submit inventories and reports on water and lead service lines. S6 cited EPA guidance in support of copper fittings for reducing lead risk. Board members agreed that staff would draft simple written guidelines for installation and inspection and present them at a future meeting; S1 said staff would take the proposal seriously.

No formal procurement decision or vote was recorded at the meeting. The heater cost cited is an estimate discussed during the session; the town would need a formal bid and appropriation before purchasing. Similarly, the board directed staff to draft installation standards and to ensure the town’s lead-service-line inventory and reporting align with regulatory deadlines.