Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the School Facilities topic

No spam. Unsubscribe anytime.

Visitor presents facility replacement and repair cost projections to Elm River board

Elm River Township School Board · February 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At the Feb. 10 meeting a visitor, Jim Rautiola, presented projected costs from a recent study on facility replacement and repairs at Elm River Township School; the board recorded the presentation but took no formal action on the study during the session.

Visitor Jim Rautiola presented projected costs from a recent facility replacement and repair study for Elm River Township School at the board’s Feb. 10, 2025 meeting in Winona. The minutes record the presentation but provide no dollar amounts or specific timelines for replacement or repair work.

The presentation was noted under the visitors section of the meeting minutes; the board did not vote or take formal action on the study during the session. The minutes do not list next steps, funding sources or whether the study will be referred to staff or a future meeting for follow-up.

Board members present—Julie Koski, Jason Moilanen, Jim Plutchak and Linda Lajeunesse—heard the presentation. The record indicates the study was performed at the school and contained projected costs, but the minutes do not specify those projections. Any planning, budgetary or contracting steps would require future board action and are not reflected in the Feb. 10 minutes.