Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Limekill Bridge topic

No spam. Unsubscribe anytime.

Sheffield OKs $200,000 toward Limekill Road bridge replacement; total construction cost about $2.6 million

Town of Sheffield Special Town Meeting · December 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Voters approved a $200,000 transfer from the stabilization fund to support replacement of the Limekill Road bridge; officials said the state Department of Transportation is expected to fund the majority of the approximately $2.6 million construction cost. The vote was 58–1.

Town meeting voters authorized a $200,000 transfer from the stabilization fund to support replacement of the Limekill Road bridge. Officials said the total construction cost is about $2.6 million and that the Massachusetts Department of Transportation has offered to cover the majority of the cost, with the town providing the local contribution requested by DOT.

The motion to transfer $200,000 was seconded and opened to brief discussion. A speaker noted DOT’s involvement and thanked staff and state partners for securing the larger share of funding. After electronic voting, the article passed 58 yes to 1 no.

The appropriation will be used for engineering, design and incidental costs as part of the bridge replacement; the town will coordinate with state DOT on next steps and procurement.