Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Streetscape Master Plan topic

No spam. Unsubscribe anytime.

Consultant previews downtown streetscape boards, invites public feedback at May 27 open house

Downtown Development Authority (DDA) · May 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A consultant outlined boards and two design options for a downtown streetscape master plan, identifying three character zones and trade-offs (pavers, curb extensions, lighting). The DDA will hold an open house May 27 and gather public survey input to guide priorities and phased work.

A consultant presenting to the Downtown Development Authority on May 13 previewed the streetscape open-house materials that will be shown to the public May 27, stressing the project will be developed in phases and that utilities and underlying infrastructure will guide priorities.

The consultant (Tim) described three character zones for downtown — the waterfront, downtown central and downtown neighborhood — and said the team will present existing-condition cross-sections, precedent-image boards (pedestrian pavements, curb extensions, pavers, site furnishings, lighting and landscaping) and two design options: a more conservative option and a more ambitious option that tests higher-impact changes such as paver bands, curb extensions and adjusted tree and pole spacing.

Tim said the open house will be informal: participants will circulate among stacked presentation boards, complete a printed survey rating design options, and provide feedback on priorities such as hardscape, tree planting and lighting. He said staff intends to sequence work in stages—utilities and subterranean work first, then hardscape and streetscape elements—so that later decisions on fixtures, pavers and street trees align with underground infrastructure.

Board members and residents raised common trade-offs: tree-root solutions and planting approaches for street trees, whether pavers can be economically maintained and removed to service utilities, snowplow and parking implications of curb extensions (bump-outs), and dark-sky compliance for lighting. Several members urged the consultant to add simple photos and location-specific renderings to each board so walk-in participants can immediately identify the exact corner or block under discussion.

The consultant agreed to add clearer photos and explanatory graphics to the presentation boards, prepare information about cost and maintenance trade-offs for the open house, and collect public input to return to the enhancement committee and the DDA for prioritization.

Next steps: the open house on May 27 will gather public surveys; enhancement and DDA meetings will review input and identify preferred approaches for a phased master plan and follow-up public review.