Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

River Ridge board approves temporary electrical 'zombie box' for lake aerator after 3-2 vote

River Ridge Community Development District Board of Supervisors · November 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After debate over relocating an aeration system in Lake E1-C, the board approved installing a temporary 'zombie box' at the current location for $3,098, passing the motion 3-2 with Mountford and Blumenthal dissenting.

The River Ridge CDD voted 3-2 on Nov. 19 to install a temporary electrical "zombie box" at the existing aerator location in Lake E1-C rather than relocate the aeration system at this time.

Operations Manager Shane Willis reviewed Premier Lakes’ one-time work order and a revised Bentley Electric proposal that would add about 125 feet of electrical work and carry an estimated relocation cost of $10,755. Some board members suggested deferring the relocation cost to the proposed Fiscal Year 2026 budget and instead installing a temporary zombie box now. On motion by Mr. Schultz and seconded by Mr. Twombly, the board approved installing a zombie box for $3,098. The motion passed with Mr. Schultz, Mr. Twombly and Mr. Merrill voting in favor and Mr. Mountford and Mr. Blumenthal dissenting.

The board’s approval directs staff to proceed with the temporary electrical installation and revisit the full relocation proposal during future budget discussions. No amendments to the motion were recorded.