Summary

The board accepted May department reports, declared multiple pieces of town equipment surplus with starting sale values, and noted that Mitchell Contracting Corp. was awarded and is performing sewer pond work; the accountant reported a $10,000 positive change in the utility fund.

The Town of Clinton Mayor and Board of Aldermen accepted routine departmental reports, approved declaring several pieces of municipal equipment surplus, and heard an update that Mitchell Contracting Corp. was awarded the sewer pond contract.

Police Chief Davis presented the May police report; aldermen accepted it. Assistant Chief Ey summarized the fire department's May activity (136 total calls, 19 members on the roster) and the board accepted the report. Mayor Kemp summarized maintenance work completed in May, including sewer repairs, meter replacements and street pothole work; aldermen accepted the maintenance report.

Accountant Tim Butler reported the utility fund increased by roughly $10,000, bringing the balance to about $163,000, and said the street/sidewalk/bridge/sewer repair fund remained under $400,000 after recent repairs. The board accepted the accountant's report.

The board declared multiple items surplus with starting values recorded in the minutes: a 2005 Dodge Ram 2500 (starting $500); a Ditch Witch Trencher Model 3610 (starting $2,000, inspection by Alderman Matthews allowed); a Broce Broom (starting $2,000, inspection allowed); a Lagoon Harvester (starting $5,000); and a JCB M7 Series tractor/front loader/backhoe (starting $10,000). Separate motions were moved and passed for each item.

The minutes also note Mitchell Contracting Corp. was awarded the sewer pond bid and is currently working on the project. The meeting adjourned at 7:25 p.m.