Citizen Portal

Get email alerts on the Dog Park topic

No spam. Unsubscribe anytime.

Silverton staff advances dog‑park options and urges coordinated code changes for off‑leash use

Personnel and Ordinance Committee, Town of Silverton · July 2, 2026

Summary

Staff identified multiple possible dog‑park sites — including a fenced area behind the baseball field that could use existing fence line to lower costs — and recommended tying dog‑park code changes to updates of running‑at‑large fines, signage, and enforcement procedures; staff will return with an ordinance after a site is chosen.

The Personnel & Ordinance Committee discussed potential dog‑park locations and related changes to running‑at‑large enforcement (code section 7‑8‑350). Staff said several sites are under consideration and that using the back, fenced area adjacent to the baseball field could leverage roughly 514 feet of existing fence to reduce costs.

Bevon (staff) described tradeoffs between an unfenced off‑leash area and a fenced dog park and said using existing fencing or chain‑link material could allow the town to open a contained off‑leash area sooner and at lower cost. He also noted the running track and nearby swimming ponds could act as natural separations for some layouts. Members asked for clear operational details — signage, waste‑pickup infrastructure, and hours — and suggested placing grab‑bag dispensers and trash cans at the site and preparing an enforcement and education plan.

Liability questions surfaced about potential dog‑on‑dog injuries or fatalities at an off‑leash site. Committee members said they expected standard governmental immunity and common practices used by neighboring towns; they asked staff to research liability precedents and to include any recommended indemnity or signage language when they return. Members also discussed using low‑cost interim options (designating natural corridors or seasonal off‑leash areas) while longer‑term fencing is planned. Staff said grant funding and small budget allocations could cover initial outfitting and that an ordinance will be prepared once a site and plan are finalized.

The committee did not vote on a site; the next step is for staff to identify a preferred location, estimate costs, research liability and signage, and draft ordinance language for board consideration.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source