Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

River Ridge board approves $105,000 traffic-calming package including solar radar signs

River Ridge Community Development District Board of Supervisors · November 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved AV-Tech LLC proposals to install three permanent and one mobile 15" solar-powered speed radar signs with cameras and cloud messaging, plus a $1,500/year cloud subscription per device, for a combined total of $105,000.

The River Ridge Community Development District on Nov. 19 approved a $105,000 traffic-calming package to add three permanent and one mobile 15" solar-powered speed radar signs with cameras and cloud messaging.

Operations Manager Shane Willis presented AV-Tech LLC Estimates 24150 and 24151 describing installation and annual cloud-device subscription costs of $1,500 per device. PSGRC General Manager Eric Long suggested relocating an existing unit 20–30 yards to reduce speeding incidents; Mr. Willis said poles will be purchased from Paramount Asphalt for about $1,200 each.

On a motion by Mr. Schultz and seconded by Mr. Blumenthal, the board approved the AV-Tech estimates—wiring and installing three permanent and one mobile unit with the cameras and messaging, and the cloud-device plan—for a combined total of $105,000. The board discussed PSGRC criteria for issuing warnings and fines and discussed whether the homeowners association would assume ongoing cloud-device costs.

The district will proceed with procurement and installation coordination through Operations staff; annual cloud subscription costs were discussed as a recurring expense.