Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Repairs topic

No spam. Unsubscribe anytime.

Selectmen approve repairs to town floats and dock; M. Young to perform work

Town of Winter Harbor Selectmen · August 11, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Selectmen voted 3-0 to have M. Young repair town floats, fix dock damage and add two ladders; the Town Manager will order flotation materials and coordinate pickup with DC Air.

Selectmen discussed deterioration and capacity issues with the town floats and damage to the dock after it was backed into. The board agreed a contractor should repair the assets and a motion was made to have M. Young fix the floats, repair the dock and add two ladders; the motion was approved 3-0.

Town Manager Sara J. Liscomb said she will order the flotation material and that DC Air will pick up the materials. The minutes record that Chris will remove the floats and return them to his property so they can be repaired and that M. Young will perform the repairs. The Selectmen recorded the vote as Approved 3-0 and assigned follow-up tasks to the Town Manager and Public Works.