Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Split vote: River Ridge board approves temporary power solution for lake aerator

River Ridge Community Development District Board of Supervisors · November 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After debate over relocating a lake aerator and associated electrical costs, the board approved installing a temporary "zombie box" for $3,098 to power the existing aerator; the motion passed 3-2.

The River Ridge Community Development District voted 3–2 on Nov. 19 to install a temporary power "zombie box" for an aeration system in Lake E1‑C while deferring a costly relocation.

Operations Manager Shane Willis presented Premier Lakes’ one-time work order and a revised Bentley Electric proposal that would add 125 feet of electrical work to relocate the aerator farther from the originally proposed location. Board members discussed budget implications and an alternative of installing a temporary power box at the current site.

On motion by Chair Bob Schultz, seconded by Mr. Twombly, the board approved installing a zombie box at a cost of $3,098 and agreed to revisit the relocation proposal during FY2026 budget discussions. The motion passed with Schultz, Twombly and Merrill voting in favor and Mountford and Blumenthal dissenting.

The board did not adopt the Bentley Electric relocation estimate at this meeting; staff will include relocation costs for further review in next year’s budget discussions.