Planning board approves Burger King site‑plan amendment, adds second drive‑through lane
Summary
The Brunswick Planning Board approved a site‑plan amendment for the Burger King at 747 Music Road on July 2, 2026, authorizing branding updates, a second drive‑through lane, minor parking and ADA adjustments, relocated dumpster and additional landscaping after a short public hearing and SEQR negative declaration.
Get email alerts on the Site Planning topic
No spam. Unsubscribe anytime.
The Brunswick Planning Board on July 2 approved a site‑plan amendment for the Burger King on 747 Music Road that will add a second drive‑through lane and make modest site improvements, the project’s engineer said.
"The purpose of the project in general is just branding upgrades and some improvements to the site in general for pedestrian and vehicle circulation," said Craig Trip, the landscape architect representing the applicant. He told the board the work includes a relocated light pole to make room for the additional lane, new menu and order boards, reconstructed sidewalks for ADA access, relocated dumpster and new landscaping along Route 7 requested at earlier reviews.
Resident Jim Tachic asked whether the highway sign would change size. "Is that going to be approximately the same size as the existing one?" he asked. Trip said the structural sign will remain in place and only the sign panel will be updated.
After hearing from the applicant and one brief public question, the board closed the public hearing, declared a State Environmental Quality Review negative declaration and voted to approve the site‑plan amendment as submitted. The board recorded the actions in the meeting minutes; the transcript records voice votes but does not include individual roll‑call tallies.
The board noted the applicant submitted updated full‑size plan sheets and that the building department and county reviewers had no outstanding objections. The approved changes do not alter the site's utilities, Trip said, and the plans include an electrical conduit stub for a potential future piece of equipment the applicant called a "bun freezer." The applicant also said a pre‑construction meeting with the building department will be held before work begins.
The board’s approval included the SEQR negative declaration and no additional conditions were specified on the record. The applicant will file the final plans and proceed with building‑department permitting and any required coordination with the New York State Department of Transportation for driveway or signage work.
The board moved on to other agenda items after the vote; no appeals or conditions were recorded during the meeting.