Silver Creek Township OKs up to $15,000 for tree trimming; Baker Avenue culvert plan deadlocks
Summary
The Board approved up to $15,000 for tree trimming by Carr's Tree Service and split 2-2 on a Baker Avenue culvert alteration, leaving the drainage project unresolved and flagged for further review.
Get email alerts on the Infrastructure Maintenance topic
No spam. Unsubscribe anytime.
The Silver Creek Township Board of Supervisors approved up to $15,000 for tree trimming by Carr's Tree Service during its Oct. 1 meeting. Chairman Mike Helman moved the measure and Vice Chairman Brandon Geyen seconded; the motion carried 4-0.
The work was presented with a $12,000 estimate from Carr's Tree Service; the Board authorized a modest contingency (authorization “up to $15,000”) to accommodate any necessary scope increases. The authorization was framed as maintenance to address safety and right-of-way clearance concerns.
On a separate maintenance item, the Board considered a proposal to lower a culvert on Baker Avenue. Vice Chairman Brandon Geyen raised liability concerns about altering water flow; Supervisor Ryan Nelson moved to complete the project as needed and to consult the township attorney about liability, with Chairman Helman seconding. The motion resulted in a 2-2 split and was not carried, leaving the committee without a clear directive to proceed.
Board members also discussed but did not act on replacement tires for a Chevrolet 1500, and noted that a hydraulic study is budgeted for 2025; the Board said it will gather estimates for that study, which officials said should remain valid for five years once completed.
Next steps: the tree trimming contract may proceed under the approved authorization. The Baker Avenue culvert matter will require further legal or technical review before any construction moves forward.