Proposal for Lyman Apple Nine drainage presented; enforcement updates reported

Middlefield Inland Wetlands and Watercourses Agency · June 17, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A presenter described proposed drainage improvements for Lyman Apple Nine including eight-inch drain spacing and a dewatering vault; commissioners were told a formal permit application will be submitted later. The Enforcement Officer reported on a Baileyville Road issue, a Ducktail Farm site visit for invasive species removal, and a proposed drainage dredge.

At its June 17 meeting, the Middlefield Inland Wetlands and Watercourses Agency heard a presentation on proposed drainage improvements for the Lyman Apple Nine field. The presenter described installing drainage with approximately eight-inch spacing, using excavated material for regrading, reseeding and pothole repairs, and routing water through a carrier line to a dewatering vault before discharge into the meadow. The presenter said the overall grade of the site would remain unchanged and that a formal permit application will be prepared and submitted at a future meeting.

During the Enforcement Officer's report, staff noted an issue on Baileyville Road had been referred to Zoning Enforcement Officer Zoe Chatfield, and that a site visit was conducted at Ducktail Farm in connection with removal of invasive species. Commissioners also discussed a proposal to dredge a new drainage line. No public comment was recorded on these items.

The agency did not take final action on the drainage proposal at this meeting; staff or the applicant will return with a formal permit application and additional details for Commission review.