Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Union City approves $22,295 repair to sinkhole, pipe at Municipal Lot #1

Union City Borough Council · August 13, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council approved contracting Mansfield for $22,295 to replace a 24-inch clay tile, reconnect pipes, replace a catch basin and repair a sinkhole at Municipal Lot #1; McLallen Construction provided a comparable estimate.

Union City Borough Council voted to award a public-works contract to Mansfield for $22,295 to repair sinkhole damage and associated storm pipes at Municipal Lot #1.

Streets Supervisor Bob Phillips described a sinkhole affecting a 24-inch clay tile and said engineers recommended replacing the damaged tile in sections, reconnecting pipes in the sinkhole to the 24-inch line, replacing the nearby catch basin with a larger unit and replacing about 10 feet of pipe. Engineer Tim Wells and contractor representative Bob Carpenter provided suggestions and two written estimates: Mansfield $22,295 and McLallen Construction $23,450. Council approved the lower Mansfield bid; the borough must provide a truck during the project.

The motion to authorize the work was made by Councilor Steadman and seconded by Councilor Osborn and carried unanimously. Council did not specify a start date in open session.