Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Maintenance Development topic
No spam. Unsubscribe anytime.
Board reviews dam, lake and road maintenance; new house at 830 Stonegate reported
Summary
Trustees discussed dam repairs, lake and beach cleanup with Ultra Excavating, culvert clearing and planned rock placement, and a reported new house build at 830 Stonegate; timelines and contractors were noted but several details were not specified in the minutes.
Get email alerts on the Maintenance Development topic
No spam. Unsubscribe anytime.
The Briarwood Action Association board reviewed multiple routine maintenance and development updates at its May 12 meeting, including dam repair plans, lake and beach cleanup, culvert work and a reported new house construction at 830 Stonegate.
Under the dams report the minutes record 'Pinsen will rock the dam' as the planned repair step; the minutes do not clarify whether 'Pinsen' is a contractor or an internal shorthand. The lake and beach report notes that fish have been stocked (the minutes do not list quantity or species) and that Ultra Excavating will assist with clearing the beach; picnic tables are expected to be installed after the cleanup.
On roads, the minutes state that Jim and Rob cleaned out culverts and will add rocks, with work expected to be completed by the end of May. The minutes also record a suggestion to consult Vice President Greg Davis about renting an excavator or hiring contractors for major culvert damage. The Architectural Committee entry records that 'Mike Bax Bolder is building a house by the Sherman’s for Domkoski Residents (2# Carrot Cake LLC),' noted as an update rather than a permit action.
Most maintenance items were recorded as reports rather than formal motions; the minutes do not list estimated costs or firm contractor contracts for the repair projects.
