Fairfax County staff present draft updates for Fairfax Center core; remove Metro funding contingency for mall redevelopment
Summary
County planners unveiled first-draft plan text for the Fairfax Center core area, proposing a conceptual graphic, FAR adjustments across multiple land units and three options to improve connectivity between Government Center and Fairfax Corner; staff invited written comments and set a July 20 follow-up on transportation.
Get email alerts on the Land Use topic
No spam. Unsubscribe anytime.
Ryan Stewart, a senior planner with the Fairfax County Department of Planning and Development, presented the task force’s first draft plan text for the Fairfax Center suburban core and asked members to focus their review on key edits and the new conceptual framework.
"We've removed that contingency," Stewart said, referring to the prior requirement that mall-area redevelopment be tied to Metro funding, and proposed an equitable mixed‑use intensity across the mall land unit of up to 1.25 floor‑area ratio (FAR). The change is intended to allow incremental redevelopment before any heavy‑rail station is built.
Why it matters: the draft folds countywide policy updates and newly adopted urban design guidance into area‑level text and identifies where intensity or use changes could occur across land units A and B. Staff said the text is guidance, not regulation, and that zoning and entitlement processes would implement changes.
Key proposals and staff findings
- Mall land unit: staff proposes eliminating the Metro‑funding contingency and allowing mixed‑use redevelopment up to 1.25 FAR across the land unit rather than fragmenting intensity by parcel. Stewart told the group staff and the mall owners have prepared scenarios showing 1.25 FAR is feasible within plan constraints.
- Subunit updates: A2 remains mixed use around 1.0 FAR with some sites allowed to 1.25; A3 reflects completed residential development (Park At Fair Oaks) at about 1.25 FAR. Fairfax Corner was described as suitable for an increase in intensity (staff referenced prior exercises up to roughly 1.0–1.2 FAR) contingent on transportation mitigations.
- Government Center: staff proposed a civic mixed‑use model up to roughly 1.0 FAR for developable areas, while preserving wooded conservation areas and emphasizing open space, gathering places and civic activities on the campus.
- Connections and transportation alternatives: the presentation showed three plan‑level connection options across I‑66/Monument Drive to improve connectivity between land units: (a) a Government Center Parkway flyover (steep grade and engineering constraints), (b) a slightly lower‑slope connection crossing Random Hills Road, and (c) a longer, lower‑slope alignment farther down Random Hills Road. The transportation consultant flagged slope, topography and potential VDOT constraints and said further engineering and feasibility work would be required.
Questions from task force members focused on the connection alignment, security at the Government Center, and whether the proposed FARs are high enough to meet future demand. Bernie asked staff to show the Fairfax Center area graphic and to clarify the recommended connection north across Monument Drive; Stewart said the plan includes a single connection shown in the graphic and that the form (vehicular or multimodal) remains open for study.
Responses from stakeholders
- Brian Clifford, speaking for mall interests, said owners previously sought 1.5 FAR during early discussions and that staff suggested scaling back; he noted prior amendments had already decoupled a 1.0 FAR from Metro funding.
- Mary Cortina asked whether security requirements at Government Center had been reviewed for new connections; Stewart said staff had consulted leadership and were "not aware of any concerns," but noted the planned connection was intended to fall within the existing Government Center footprint to avoid security barriers.
Process and next steps
Stewart asked task force members to submit written comments; staff will advertise a broader community meeting in mid‑July and hold task force meeting No. 10 on July 20 to examine transportation and schools. Staff expects to finalize materials for planning commission and Board of Supervisors hearings in September and October and asked members to provide comments before mid‑August so staff can publish a staff report for public hearings.
What the draft does not decide
Staff emphasized the draft provides conceptual guidance; it does not identify a final Metro station location, it does not adopt zoning changes, and it commits to further transportation and engineering study before any specific road or rail alignment is advanced.
Provenance: this article is based on task force presentations and Q&A recorded throughout the meeting, including the plan overview, discussion of FAR changes for the mall and Fairfax Corner, government center visioning, the three connection alternatives, and the schedule for community outreach and hearings.