Road Commissioner reports storm cleanup, ramp material on hand and FY27 culvert replacements planned

New Ashford Select Board/MLP · June 15, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Road Commissioner Keith Lacasse reported a tree fall that caused a power outage on Beach Hill Road which the Fire Department cut and he cleared; he said he backed road sides with 10 loads of material from Condron plus six loads from the salt shed, has material for a ramp on site, and expects to replace culverts on Greylock Road and two on Ingraham Road in FY27.

Road Commissioner Keith Lacasse updated the board on storm cleanup and short- and medium-term road work. He reported that a tree fell on Beach Hill Road causing a power outage; the Fire Department cut and moved the tree off the road and Lacasse completed cleanup. He also cleared a tree that fell near the bottom of Roys Road.

Lacasse said he had backed the sides of town roads with 10 loads of material from Condron and used six loads already at the salt shed. He reported that material for a new ramp is on site and that he will repair a crack in the Town Hall basement wall before building the ramp. He said the sides of town roads were mowed.

Looking ahead to FY27, Lacasse said he expects to replace a culvert on Greylock Road and two on Ingraham Road, and requested storing material in the salt shed for emergencies. He also said he will perform ditch cleaning and patching as part of routine maintenance.