Summary

Mr. Johnson told the council that Well No. 5 tested within discharge thresholds and that he will submit a plan for backwash discharge to the onsite basin as part of an application in progress with NJ Future; numeric thresholds were not specified in the transcript.

At the Jan. 7 reorganization meeting Mr. Johnson reported that water tests for Well No. 5 were within the thresholds for discharge. He said he will prepare and submit a plan for backwash discharge to the onsite basin as part of an application that is in progress with NJ Future.

Mayor Grova also reminded the council that a drainage control plan must be submitted by Dec. 31, 2025 to meet NJDEP requirements tied to the ongoing application and ordinance process; the meeting transcript does not include the numeric discharge thresholds or the full technical specifications of the drainage-control measures.

The updates were presented as operational compliance steps; no formal vote or approval of technical plans occurred during the meeting, and the transcript does not record public comment on the water or drainage items.