CDD approves lower-cost 'zombie box' instead of relocating lake aerator in 3-2 vote

River Ridge Community Development District Board of Supervisors · November 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After reviewing a proposal to relocate an aeration system in Lake E1-C, the board approved installing a 'zombie box' at the existing location for $3,098 rather than spending an estimated $10,755 to move equipment; the motion passed 3-2.

The River Ridge board considered revising the planned relocation of a Lake E1-C aeration system at its Nov. 19 meeting. Shane Willis presented Premier Lakes’ one-time work order and a revised Bentley Electric proposal that added roughly 125 feet of electrical work to move the aerator farther from the originally proposed spot.

Board members discussed budget implications and an alternative of installing a 'zombie box' at the present location and deferring any full relocation until the Fiscal Year 2026 budget can be revisited. On motion by Chair Bob Schultz, seconded by Mr. Twombly, the board approved installing the zombie box at a cost of $3,098. Mr. Schultz, Mr. Twombly and Mr. Merrill voted in favor; Mr. Mountford and Mr. Blumenthal dissented (motion passed 3-2).

The minutes show the higher relocation estimate discussed was $10,755; the board elected the lower-cost interim solution. Staff noted the $3,098 installation will proceed and that the relocation question may reappear in future budget discussions.