Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Utilities topic

No spam. Unsubscribe anytime.

Brownsville reports water-main repairs, Well No.1 work and completion of PSC and chloride reports

Village of Brownsville Village Board · July 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Superintendent Lechner told the board the village completed annual PSC and chloride reports, is finishing a water/sewer audit, repaired a water main break at Michels and is repairing Well No.1; he also noted an improperly formatted spreadsheet was submitted to the EPA about lead reporting.

Village Superintendent Lechner updated the Village of Brownsville Board on water-system maintenance and reporting at the Feb. 12 meeting.

Lechner said the village completed its annual Public Service Commission and chloride reports and that the water/sewer audit is nearly finished. The superintendent told the board the village discussed a proposal regarding trade-plan credits for solar panels (a potential crediting approach to be considered by staff and the board).

Lechner reported the village experienced its first water main break of 2025 at a location identified as Michels; he said repairs have been completed. He also reported that Well No.1 was inspected, required repairs and that reassembly was expected the following week.

Separately, Lechner told the board that an improper spreadsheet layout had been submitted to the U.S. Environmental Protection Agency in a filing that stated there was no lead in village water lines; the minutes record the submission error and that staff are addressing the filing layout issue.

The updates were provided as part of routine public works reporting; the board took no separate formal action on these items at the meeting.