Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Sewer Utility Repairs topic

No spam. Unsubscribe anytime.

Boaz trustees review sewer utility repairs and order replacement pumps and supplies

Village of Boaz Board of Trustees ยท January 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

President Jean Nicks reported the sewer utility has one rebuilt new-style pump, another at ASI for repair, no new alarm boxes, and two new cables with incorrect ends; she ordered two pumps, two cords, and two boxes and will work with maintenance to standardize inventory records.

The Village of Boaz Board reviewed repair needs and equipment inventory for the Boaz Sewer Utility at its Jan. 13 meeting and instructed staff to standardize inventory tracking and replenish key parts.

President Jean Nicks reported Davy Engineering had emailed about contacting two residents for water-quality trading projects; she will contact one resident and ask Kerry Gies to contact the other. On utility repairs, she said one new-style pump has been rebuilt and a second pump is at ASI for repair; there are presently no new alarm boxes in inventory and two new cables were delivered with incorrect ends. To address shortages, Nicks ordered receptacle connectors, two new pumps, two cords and two alarm boxes. The Board directed maintenance to build a consistent inventory list going forward.

The minutes do not record cost estimates, vendor delivery dates or a schedule for installation. Trustee comments and votes on the repair items were not recorded beyond the inventory and ordering decisions noted in the minutes.