Board approves contracts for septic replacement, vestibule, window film and stage edging
Summary
The board authorized capital-reserve-funded contracts: Wind River Environmental for septic tanks ($31,470), Parette Somjen Architects for associated professional services ($6,000 plus expenses), Servo Pro for vestibule repairs ($5,212.28), BRG Corp for teller window and blackout film ($11,288), and Hannon Floors for stair nose edging ($21,721).
Get email alerts on the Capital Projects topic
No spam. Unsubscribe anytime.
The Green Township Board of Education voted July 16 to award multiple operations contracts for capital projects funded from the district’s capital reserve.
The board approved a contract with Wind River Environmental Company to remove and install two 2,000-gallon precast septic tanks at a total cost of $31,470, funded from capital reserves. The board also approved a professional-services agreement with Parette Somjen Architects for the septic-tank project, a flat fee totaling $6,000 plus reimbursable expenses for information gathering, schematic design, applications, construction documents and related tasks.
For site improvements, the board approved a proposal with Servo Pro to remove three glass panels and replace the opening with sheetrock for $5,212.28, and a BRG Corp contract to install a teller window and blackout film for $11,288.00, both identified as funded through capital-reserve budget items for the vestibule project. Separately, the board awarded Hannon Floors $21,721 for removal and replacement/installation of stair nose edging and risers on the stage.
Each contract motion was presented under Operations and recorded in the meeting minutes as motions for award and funding from the 2025–26 capital budget. No dissenting motions or tabling were recorded in the minutes for these items.