Hamlin commission approves Type 2 negative declaration, conservation permit for pool drainage project at 17 Summerhaven Drive

Hamlin Planning Commission · July 7, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Representatives for Pass Road Associates told the commission flooding at 17 Summerhaven Drive prompted a pool reconstruction and drainage project; the commission cleared a Type 2 negative determination and approved the conservation/development permit with conditions.

The Hamlin Planning Commission approved a Type 2 negative declaration and granted a conservation/development permit on July 6 for a pool reconstruction and drainage project at 17 Summerhaven Drive after hearing from Lon Potts of Pass Road Associates.

Potts described underdrain installation around the pool and patio, the addition of a sump/effluent pump and connections to existing 2‑inch and 6‑inch storm lines that discharge to Lake Ontario. He said the site has experienced flooding at the garage and house and that the work is time sensitive.

Commissioners pressed for confirmation that drainage would be contained on site, that no increase in impervious area was proposed, and for clarity about the age and condition of existing sump pumps and pipes. Staff and members discussed federal/state wetland mapping and the town’s conservation overlay; staff advised leveraging state/federal wetland data rather than reinventing local mapping rules.

After questions were resolved, a motion for a Type 2 negative determination and issuance of the conservation permit for the drainage work passed by roll call. Staff will record permit conditions and closure of outstanding technical items.