Bolton wetlands commission approves larger culvert at 1079 Boston Turnpike

Bolton Inland Wetlands Commission · July 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Inland Wetlands Commission approved replacing a 24-inch corrugated pipe with a 30-inch pipe and extending it to 53 feet at 1079 Boston Turnpike, with one member abstaining from the vote.

The Bolton Inland Wetlands Commission on Oct. 22 approved an application to replace a 24-inch corrugated metal pipe with a 30-inch pipe and extend it 32 feet for a total length of 53 feet at 1079 Boston Turnpike.

Applicant Frederick Davis told the commission he has stabilized the property and wants to place additional fill and stone to cover the new pipe. Wetlands Agent Alyssa Barroso said she does not regard the proposed fill as a substantial deviation from the applicant’s original plan and that the work appears stabilized.

Chair Ross Lally asked whether the change represented a substantive alteration to the permitted plan and the commission concluded it did not. James Loersch moved to approve the application; Diana DeNunzio seconded. Michael McDonnell abstained. The motion carried 3–0–1.

The commission recorded that the pipe will be enlarged from 24 inches to 30 inches and that the planned extra fill would not require lengthening the pipe. The approval delegates field oversight to the agent for ensuring stabilization and compliance with the approved work.

The approval was a final action on this item at the Oct. 22 meeting; no additional conditions or a separate hearing were recorded in the minutes.