Design commission recommends right-of-way closure for storefront renovation at Kings Of Leon Lane

Downtown Design Commission · June 19, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission recommended approval to the Planning Commission for a 15-foot right-of-way closure (and a one-foot strip) to enable a storefront entry and façade improvements at 515 Kings Of Leon Lane; staff said the closure preserves ADA access while enabling the renovation.

The Downtown Design Commission voted June 18 to recommend that the Planning Commission approve a partial closure of public right of way to accommodate a storefront renovation at 515 Kings Of Leon Lane.

Senior planner Michael Fulbrick described the proposal (CE-01161) as a 15-foot closure in front of an older industrial building to allow a new deck-entry storefront and a one-foot strip closure along the east building face to allow potential recladding. He said Public Works would not accept a revocable permit for the long-term deck solution and that a permanent closure would resolve the design constraint.

Fulbrick said staffs reviewed the proposal and recommended forwarding a recommendation of approval to the Planning Commission. The applicant told the commission the design will preserve full ADA access around the building and that Planning Commission had already recommended approval; the applicant noted a true closure process can take nine to 12 months while a revocable permit takes about two weeks.

A commissioner moved to recommend approval to the Planning Commission and the motion passed. Commissioners asked staff to encourage street trees and streetscape improvements near the site as part of follow-up coordination.