Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Road Projects 2024 topic

No spam. Unsubscribe anytime.

Town of Townsend outlines road resurfacing, chip sealing and gravel conversions

Town of Townsend Board · July 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board reviewed a multi-street road work plan including resurfacing on Meadow Parkway and related streets, chip sealing on Smokey Lake Ln and Memory Ln, targeted patching, and conversion of Deer Track and Hyland to gravel with the town paying half a gravel batch.

Town of Townsend board members described planned road and maintenance work at the May 14 meeting. Key elements included resurfacing Meadow Parkway with Hidden Meadow, Green Meadow, Mallard and Mockingbird and Presbyterian (Cunningham to County T deferred to 2025); chip sealing Smokey Lake Lane and Memory Lane; flex patching Scotch Pine Lane and infrared patching on Surprise, Forest Hill and Water Lane; and converting Deer Track and Hyland to gravel with the town covering half a batch of gravel.

The board gave these plans as its maintenance priorities; the transcript does not record formal adoption votes, cost estimates, contractor names, or precise timetables beyond a general 2024–2025 horizon for deferred items.