Citizen Portal

Get email alerts on the Building Permits topic

No spam. Unsubscribe anytime.

Surry selectmen note building permit updates and state-approved septic design

Surry Selectmen · August 5, 2024

Summary

The selectmen recorded updates on a metal-storage building permit and a $25 electrical upgrade permit, and noted a Hagstrom septic design has state approval; Courtney Davis was asked to arrange a gas-heater inspection with the fire department.

At their Aug. 5 meeting the Surry selectmen reviewed two building-permit matters and a septic approval. Courtney Davis updated the board on a building permit for a metal storage structure on Route 12; the selectmen declined to extend the permit and noted that the Hagstrom septic design linked to the project has been approved by the State. The board asked Davis to contact the fire department to schedule a gas-heater inspection.

Selectman Jay Croteau also reported emailing building permit #1681 for an electrical upgrade to Empower/Glenn Davis; a $25 fee is due. No formal objections or additional conditions were recorded in the meeting minutes.

The record shows routine administrative follow-up: a required heater inspection and collection of the modest permit fee. Residents or contractors with questions were told to contact the town office for next steps.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source