Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Accessibility Historic Buildings topic

No spam. Unsubscribe anytime.

Board gives conditional concept approval for stair lift, porch redesign at 238 East Poplar to improve access

York City Historical Architectural Review Board · July 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved concept approval for a porch redesign and installation of a stair (chair) lift at 238 East Poplar to improve access for a chair-bound resident, contingent on engineers’/architects’ drawings and consultant review and with the requirement that installation be reversible and not damage brickwork.

The York City Historical Architectural Review Board granted concept approval for the proposed porch redesign and stair (chair) lift at 238 East Poplar, subject to final engineered and architectural drawings and review by the city consultant.

The applicant (S9) explained that a vertical platform lift would not fit the site and that insurance limited options to a front approach; the current proposal shortens the porch, rebuilds a landing and installs a stair lift so a chair-bound resident can enter and exit the home. The board discussed routing, mounting and the effect on adjacent windows and the gas meter.

Why it matters: board staff/consultant (S6) emphasized that accessibility requirements (ADA) can supersede preservation concerns when installations are reversible, saying accessibility wins if the intervention is reversible. Members highlighted the need to avoid drilling into historic brick and asked that the stair-lift slide rail be mounted on independent framing when possible.

Conditions and details: the board asked the applicant to provide engineered drawings showing how the stair lift, landing, railings and gas meter clearance will be accommodated; the board asked that materials be painted wood for visible elements and that railings be painted iron or aluminum to replicate the existing aesthetic. Approval was explicitly tied to consultant review of final drawings and the stipulation that work must be reversible and avoid damaging historic masonry.

Decision: Committee member (S3) moved to approve the application concept subject to the city consultant's final drawings review; the chair (S2) seconded and the motion passed on a voice vote.

Next steps: applicant to submit detailed drawings, and the city consultant will review for permitting and final COA conditions.