Commission approves Lanterna (LaTurna) Phase 1A and 1B preliminary plats with staff conditions
Summary
The commission voted to approve preliminary plats for LaTurna/Lanterna Phase 1A (54 townhouse lots) and Phase 1B (24 single‑family lots) subject to staff conditions including coordination on traffic and drainage and required road improvements.
Get email alerts on the Subdivisions topic
No spam. Unsubscribe anytime.
The Baldwin County Planning Commission approved preliminary plat applications for LaTurna (also referred to in staff materials as Lanterna) Phase 1A and Phase 1B on July 9, voting to carry both items forward with the staff‑recommended conditions.
Staff summarized Phase 1A (SPP26‑06) as a preliminary plat for 54 townhouse lots in Planning District 15 under RMF‑6 zoning, and Phase 1B (SPP26‑07) as a 24‑lot RSF‑2 single‑family phase. The staff presentation noted required coordination with Baldwin County Highway Department and permit engineers on traffic‑study review, required road improvements, and wetland buffers and drainage narratives. "Staff's recommending approval of the Lanterna phase 1 preliminary plat with the following conditions," the staff presenter said.
Public commenters raised the same local concerns heard earlier in the evening — traffic on Pleasant Road, potential flooding and protection of wetland buffers — and asked about how a revised traffic study would be shared with residents. Staff said a revised traffic study had been submitted after the staff report and is under review by the county highway department and a third‑party consultant; final traffic and construction approvals will occur at the engineering and construction plan review phase.
Commissioners moved and seconded motions to approve both phases subject to standard staff conditions; both motions passed on voice votes.
What happens next: Approval of a preliminary plat does not authorize construction. Developers must submit detailed site plans and construction drawings for permit engineer review and must implement required roadway and stormwater improvements before final platting or construction authorization.