Summary

Officials announced a six-week closure of the US Route 130 bridge over Oldmans Creek for repainting (Dec. 16, 2024–Jan. 27, 2025) with a posted detour. The committee also approved Fralinger Engineering PA for design and inspection of 53 Auburn water service laterals ($41,900) because of a new state requirement to replace suspected lead or copper service piping.

Oldmans Township officials told the committee on Oct. 9 that the U.S. Route 130 bridge over Oldmans Creek will be closed for repainting and maintenance from Dec. 16, 2024 through Jan. 27, 2025. The minutes state the detour will use Porcupine Road, Straughns Mill and I-295 and that signs will be posted to guide traffic.

On water infrastructure the township approved a contract with Fralinger Engineering PA for civil design, bidding and construction inspection for the installation of 53 water service laterals in Auburn at a cost of $41,900. The work responds to a new state requirement that service lines between the water main and a residence be replaced if suspected to be lead or copper; an ordinance to authorize the program will be introduced at the November meeting.

In related public-service items the clerk noted a municipal repaving bid is due Oct. 25 and the winning bidder will be awarded the contract at the November meeting. Mayor David Murphy also reported that Perkintown Road can be repaved once the soil settles following pipe replacement, after a discussion with Commissioner Ed Ramsey.

The minutes do not record detailed construction phasing or a contractor timeline for the water lateral work; the contract award and the bridge-closure dates are the primary scheduling information recorded.