The Williamson County Planning Commission approved final plats for Wild Oak, Marlowe Springs and Flint Meadows and voted to release the Pine Creek Section 2 wastewater maintenance bond after staff found the two-year maintenance period satisfied.
Get email alerts on the Plats And Bond Release topic
No spam. Unsubscribe anytime.
The Williamson County Planning Commission approved three plat applications and voted to release a maintenance bond for Pine Creek Section 2 after staff said the two-year maintenance period had been satisfied.
Staff presented the Wild Oak Large Lot Easement Subdivision (Coleman Road), describing a 35.6-acre development with five lots and a shared access easement; staff said water would be provided by a utility district listed in the staff materials and that wastewater would be handled by on-site septic systems. The commission approved the item by voice vote.
On Marlowe Springs at Carl Road, staff recommended approval of the final plat and described five lots and a shared access easement. The transcript contains conflicting area figures for this item: an early announcement listed "91.81 acres," while the staff presentation later referenced "16.21 acres." The record does not resolve this discrepancy; the commission approved the final plat by voice vote after a brief clarification about a stub road connecting easements.
For Flint Meadows (re-subdivision of Lot 1, Steeplechase Lane), staff told commissioners the proposal covered 18.25 acres and would create three lots plus two family-subdivision lots; water and wastewater services were noted as provided by the Harpeth Valley Utility District. Staff recommended approval with standard conditions and the commission approved the plat by voice vote.
During the meeting the commission had previously added a non-agenda item (item 39) for Pine Creek Section 2. Staff reported that "this bond has satisfied the requisite two year maintenance period, and therefore, staff recommends releasing the bond." The commission voted to release the Pine Creek Section 2 maintenance bond for the wastewater collection system by voice vote.
All approvals in the record were by voice vote with the chair calling for "aye" and noting the motion passed; no roll-call tallies were recorded in the transcript. Staff indicated standard conditions in staff reports apply to the plat approvals; the transcript does not enumerate those conditions during the spoken record.