Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Resolution Compliance topic

No spam. Unsubscribe anytime.

Board authorizes short compliance letter after dry‑well discovery at 100 Harvard

Fair Haven Zoning Board of Adjustment · January 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board confirmed that a dry well discovered during resolution‑compliance review for 100 Harvard appears to address prior stormwater conditions and authorized counsel and the borough engineer to memorialize compliance in a one‑page resolution or letter so construction can continue.

Members briefly reviewed resolution compliance for a previously approved application at 100 Harvard and learned construction crews discovered an existing dry well near the proposed work.

Board engineer (speaker 8) said the dry well appears to exist where the compliance package had anticipated new stormwater infrastructure, and that the applicant’s submission was compliant ‘‘minus the colors’’; the engineer suggested a short written confirmation in the resolution file to document the discovery and any agreed next steps.

Chair and board members authorized board attorney and the borough engineer to prepare a one‑page resolution or letter documenting compliance and to allow the engineer to confirm the dry‑well capacity so the project can proceed without requiring the applicant to return to the public hearing for a second compliance sign‑off.

The board instructed staff to attach the dry‑well notes to the resolution compliance file for future reference.