Selectboard discusses drainage work on Dr. True Road and Maple Circle
Summary
The Selectboard discussed drainage and runoff prevention for Dr. True Road and Maple Circle, agreeing that work should meet or exceed recommendations from the Gale study and that some costs could be covered by the Watershed Preservation CRF.
Get email alerts on the Drainage Watershed topic
No spam. Unsubscribe anytime.
On May 6 the Sanbornton Selectboard reviewed proposed drainage work for Dr. True Road and Maple Circle and directed the Highway Department to refine plans and cost estimates.
Highway Department Director Johnny Van Tassel said he would rent an excavator to perform drainage work and could add riprap to reduce runoff. Selectman Mark Brown noted that Maple Circle is not explicitly covered by the town’s Gale study but observed that drainage upgrades are needed to prevent runoff into the lake. Selectman Ralph Carter mentioned that a Vortechs system at Maple Circle had not been completed and suggested that completion be funded from the Watershed Preservation Capital Reserve Fund.
Selectman Brandon Deacon said any work should meet or exceed Gale recommendations. The board asked the Highway Director to determine existing road widths, the width required, and compare costs for performing the work in-house versus hiring a contractor.
Next steps include returning to the board with measurements and cost estimates so the Selectboard can determine funding and a timeline.