Board adopts stormwater management flow chart with infiltration calculation requirement

Blair Township Board of Supervisors · August 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Blair Township adopted option two of a preliminary stormwater management flow chart after the Planning Commission recommended adding wording that requires submission of infiltration pit calculations with permitting.

The Blair Township Board of Supervisors voted to adopt a Stormwater Management Flow Chart that adds a requirement to submit infiltration pit calculations with permitting.

Eric Banks presented the preliminary flow chart to the Planning Commission and reported the commission favored option two after discussion and clarification. The recommended version includes additional wording that applicants must provide infiltration pit calculations when submitting permits.

Chairman Paul Amigh moved to approve the Stormwater Management Flow Chart using option two; Supervisor Brad Germaux seconded and the motion passed with two yes votes. The change clarifies the technical submission requirements for stormwater permits going forward.