Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Landscaping Policy topic
No spam. Unsubscribe anytime.
Melbourne Beach planning board narrows landscaping rules: 8-tree minimum and oak-for-oak replacement agreed
Summary
After hours of line-by-line review the Planning & Zoning Board agreed to an 8-tree minimum for new single-family lots, to require oak-for-oak replacement for mature oaks, to remove a hard 50% native-plant mandate and to revise planting-size standards (leaning toward a 2-inch caliper planting minimum); members also approved edits to sections 9a6 and 9a7 and asked staff to issue a consolidated clean draft.
Get email alerts on the Landscaping Policy topic
No spam. Unsubscribe anytime.
The Melbourne Beach Planning & Zoning Board spent the bulk of its July 7 meeting continuing a line-by-line revision of proposed landscaping and tree regulations and reached several substantive decisions that narrow and clarify the draft language.
Key decisions and direction
- Minimum trees: The board agreed on a minimum of eight trees for new single-family lots. The minimum will include any required oak replacements.
- Oak replacement: For mature oak trees removed to accommodate new construction, membership settled on an "oak-for-oak" replacement requirement: each mature oak removed must be replaced by another oak.
- Native-plant mandate removed: The draft's prescription that landscaping plans contain 50% plants from the Florida Native Plant Society list was deleted. Instead the board agreed to encourage the University of Florida's Florida Friendly Landscaping principles, which allow both native and nonnative species that meet drought-tolerance and wildlife-support objectives.
- Planting size and caliper: Members debated trunk caliper and planting-size metrics. After discussing arborist guidance that smaller container-grown trees can establish better, the board moved toward a 2-inch caliper planting minimum for canopy trees (with planting height and spread minimums to match the selected caliper standard) rather than requiring larger-caliper transplants in all cases.
- Palms and ornamentals: Board members accepted an 8-foot minimum height for palms at planting and removed several commercial-buffer spacing rules that were inappropriate for single-family lots.
- Tree removal permitting and relocation: In section 9a6 (criteria for tree-removal permitting), the board agreed the town may require an arborist or forester recommendation when a property owner requests tree relocation (to assure the tree is a viable candidate for transplant). Members left this requirement discretionary rather than mandatory in every case.
- Cleanup, renumbering and next steps: The board deleted redundant language, renumbered subsections for clarity and instructed staff to assemble a clean consolidated draft (reflecting the accepted edits to 9a6 and 9a7) for the next meeting. A motion to accept the changes to sections 9a6 and 9a7 was moved and approved by voice vote.
What members said
Chair (committee member) emphasized practicality and the town's constrained planting space: "We're replacing all of the oak trees that are cut down. We're requiring that. Or canopy trees. ... We're meeting them halfway." Committee discussion repeatedly referenced swales, utility lines and the limited plantable area on many lots when weighing rigid requirements.
A board member argued against a strict native-only requirement and for flexibility: "Florida Friendly Landscaping may incorporate either native or nonnative plants." Another member endorsed oak-for-oak replacement: "Any oak trees removed must be replaced with another oak tree. A minimum of 8 trees, which includes any replaced oak trees, must be present on the lot." (Board members spoke from the dais; all quotes are attributed to the speakers listed on the meeting roster.)
Public process and EAB workshop
Staff reported the Environmental Advisory Board has requested a commission workshop on landscaping. P&Z members asked staff to provide EAB materials in advance (one week was suggested as reasonable) and proposed asking the EAB to delay the workshop by one meeting so P&Z can complete the ordinance review and present its consolidated draft.
Next steps
Staff will prepare a consolidated, clean draft of sections 1'7 (9a1 through 9a7 as amended) for review at the next P&Z meeting and will forward materials to the commission and the EAB for a possible workshop. The board also asked staff to refine the separate tree-removal-permit language so it clearly states when replacement is required, when relocation credit is allowed and when an arborist recommendation may be requested.

