Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Stormwater Management topic

No spam. Unsubscribe anytime.

Volunteers to build water-catchment basins for Canaan Street Lake; town to provide materials

Canaan Select Board · April 21, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Select Board approved a volunteer project by the Canaan Street Lake Association and Cardigan Mountain School students to install water catchment basins near the museum and bathhouse; the town will contribute roughly $300 in gravel and follow up on a related high-school bathhouse project.

The Canaan Select Board approved a proposal from the Canaan Street Lake Association to install volunteer-built water-catchment basins to reduce runoff near the town museum and bathhouse. Work is expected to be performed by Cardigan Mountain School students, and the town will contribute approximately $300 worth of gravel for the installation.

Select Board member Scott Johnston moved to approve the project; Chair Stephen Freese seconded and the motion carried. Freese said he will follow up on a separate high-school project to replace the bathhouse, which was discussed during the same item.

Why it matters: Town officials said the catchment basins aim to reduce stormwater runoff entering Canaan Street Lake and that engaging student volunteers would lower labor costs while offering educational opportunities.

Next steps: The board authorized the project and directed staff to coordinate logistics and material delivery; no permit or grant funding requirements were recorded in the meeting notes.