County staff recommends Martin Docks for War Hill Park pier; bid about $212,500 using SPLOST 7 funds

Dawson County Board of Commissioners · July 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Park director Matt Payne said SPLOST 7 includes $200,000 for replacement of the War Hill Park fishing pier and staff recommended awarding the IFB to Martin Docks, the low bid at about $212,000–$212,500, to be funded from SPLOST 7.

Matt Payne, park and recreation director, reviewed IFB466-24 for replacement of the War Hill Park fishing pier. He told commissioners the county previously removed a deteriorated pier and had sought grant funding; permission from the U.S. Army Corps of Engineers applies if the same footprint is maintained.

Payne said SPLOST 7 includes $200,000 for the project. Two bids were received: CNW Development for about $471,000 and Martin Docks as the low bidder at approximately $212,000–$212,500. Payne recommended the board accept the Martin Docks bid and utilize SPLOST 7 funds to complete the floating (aluminum) pier with benches and fishing areas.

Commissioners asked about whether the new pier would be covered and about bench and fishing-area details; Payne said the new structure will include benches but may not have a cover. The matter was presented for approval and will be brought forward for award in the voting session or on the consent agenda as appropriate.

The transcript contains slightly inconsistent bid figures in one segment; staff packet materials included with the agenda should be consulted for the formal bid tabulation and procurement documents prior to any contract award.