The authority approved a task order to evaluate septic-system elimination costs and commissioned a scoped study of voluntary and regulatory options for a sump-pump program to reduce inflow and infiltration (I&I); the sump-pump program was tabled pending tailored follow-up.

The Hobart City Redevelopment Authority approved a consultant task order to evaluate costs and program options for septic-system elimination and discussed a separate proposed sump-pump disconnection/connection program aimed at reducing inflow and infiltration (I&I).

For septic elimination, the board approved Task Order #12 for a one-time evaluation to develop a cost baseline and program design for converting septic-served properties to sewer connection where feasible. Staff discussed collecting contractor estimates and reviewing recent installation records to set reimbursement or subsidy levels. The packet cited a maximum amount for the study that was read aloud in the meeting (transcript numeric string was garbled; staff should confirm the exact contract ceiling in the record). The motion to approve the task order carried.

On the sump-pump program, consultants outlined a menu of detection and intervention tools — smoke testing, house-by-house inspections, camera access from mainlines, and public education — as well as policy options including voluntary incentives or fees for noncompliance. Board members emphasized the need for targeted detection (to find connected perimeter drains or sump pumps) before any broad enforcement or subsidy program. The board agreed to table action on a program design and asked staff and consultants to produce a draft tailored to local conditions and to meet with stakeholders before returning with a recommended approach.

Board members framed the initiatives as part of a longer-term strategy to reduce peak wet-weather flows. Staff said the studies will supply policy options and cost estimates to guide later implementation steps.