Select Board reviews gazebo repair estimates and approves $1,980 dugout rehab
Summary
The board reviewed three gazebo options (trim and shake-shingle roof $24,377; metal roof $18,350; replacement $15,000) and tabled the item for more details; it approved $1,980 to repair the baseball dugout.
Get email alerts on the Capital Repairs topic
No spam. Unsubscribe anytime.
The Select Board reviewed repair and replacement options for the town gazebo and approved a separate, smaller repair for a baseball dugout.
Laurel Smith outlined gazebo needs and relayed that LA Drew submitted a proposal: trim work and a shake-shingle roof estimated at $24,377, a metal roof option estimated at $18,350, or full replacement estimated at $15,000 with asphalt shingles. The board decided to table the gazebo discussion to gather additional details at a future meeting.
Separately, LA Drew submitted an estimate of $1,980 to rehabilitate a baseball dugout (remove wall, remove plumbing, install a frost-free spigot). Frank DiFruscio moved to spend $1,980 for the dugout rehabilitation; Bob Thompson seconded and the motion was approved.
The minutes record cost estimates but do not specify contractors' licenses, timelines, or funding sources for the larger gazebo project; the dugout repair was approved as a specific expense.